Massive cost savings made at a recent project!
We recently completed a project that involved us sizing, selecting and installing a great three pump booster set, making massive cost savings to the customer.
In the past few weeks we replaced an old system that wasn’t performing efficiently and causing unnecessary costs to the customer.
Upon starting the project, we sized, selected, and installed a great three pump Flowboost booster set system. The new system meant that the pumps were running at an impressive 1.5kW rather than the previous 5kW, meaning massive savings were made to the customer.
This work was carried out by our Service and Maintenance Division.
Within our Service and Maintenance Division, we operate a network of Service Engineers located throughout the UK who are supported by our offices located in Cumbria and Greater Manchester. The distribution of engineers means that in the majority of cases we are less than 4 hours away from attending a customer call out.If you’d like to see if you can make savings like these, contact our Sales team today on 0333 200 1756, or if you would like to arrange a commissioning, service, or install, call our Service and Maintenance Division on 0333 200 1813.